- Clyde & Clyde North LocalsCity of Casey specialists
- Free Onsite MeasureWritten quote, no obligation
- Built for Casey ClayProper base, steel & joints
- Quality GuaranteedClean, level, finished right
The paths that finish a property
Once the driveway is in, the next things most Clyde homeowners want are paths: a front path from the driveway to the door, a side path to the bins and the back gate, a pad for the clothesline or hot water unit area, and a slab for the bins out of sight. Concrete is the most practical surface for all of them: it's level, easy to sweep, safe for prams and wheelie bins, and weed-free.
Side paths on narrow estate blocks
On many Clyde North lots the side setback is narrow, often around a metre, with the house on one side and the fence on the other. That's tight for excavation and pouring, and it's also where drainage matters most, because the path is right against the house slab. We keep paths below the floor level and clear of weep holes, fall them away from the house, and leave or add drainage at the fence side or the low end. Where access is tight, we pump the concrete in rather than barrow it.

Front paths and entries
A front path and porch slab are part of the street view, so they usually match the driveway's finish. That's commonly exposed aggregate or coloured concrete. Steps can be formed at the porch where levels change, with a consistent rise and a non-slip finish.
Bin pads and utility areas
Small slabs for bins, the clothesline and air-conditioning units keep those areas clean and level. They're quick to add while we're already on site pouring the driveway.
Thickness and reinforcement
Paths are typically 75 to 100 mm thick with mesh, on a compacted base, with joints at regular spacing. Anywhere a car or trailer may drive gets driveway thickness.
Our Process
How your driveway gets done
Call or send the form
Tell us the job, the suburb and roughly how big the area is. A local concreter calls back to book a time that suits you.
Free onsite measure
We measure in square metres, check levels, drainage, access, the ground and the crossover, and talk through finishes.
Written quote
You get a written quote that spells out the scope: excavation, base, steel, finish, joints, sealing and clean-up.
Prep, pour and finish
Formwork, compacted base and mesh go in, the pour is finished and cut, and the site is left clean and ready to cure.
Questions
Paths & Side Access questions
How wide should a side path be?
Usually the full width of the side setback, often around one metre, so bins and wheelbarrows fit comfortably.
Can paths be poured with the driveway?
Yes. It's the best time, since it gives one finish, one mobilisation and consistent levels.
Will a path cause damp in my house?
Not if it's built correctly: below floor level, clear of weep holes and falling away from the house.
Service Areas
Concreters for Clyde and the suburbs around it
Free Quote
Get a free quote for your driveway
Tell us about the job and a local concreter will call you back to book a free onsite measure. Quotes are written, itemised and free, with no obligation.
- Clyde, Clyde North and the surrounding City of Casey suburbs
- Driveways, crossovers, exposed aggregate, patios, paths and slabs
- No call centres: you talk to the people doing the work
Prefer to talk now?
03 7074 8263Request Received
Thanks ! Someone from Clyde Concrete Driveways will call you back shortly to book your free onsite measure. For emergencies right now, please call us directly.
Call 03 7074 8263Ready for a driveway that lasts?
Book your free onsite measure in Clyde, Clyde North or nearby.